2026 Canada cost planner

What will your bathroom remodel cost?

Build a realistic, itemized budget in under two minutes. Adjust the room, scope, finishes, plumbing and region—then carry a sensible contingency into contractor conversations.

CAD estimatesNo sign-upTransparent line items
Renovated bathroom with a glass shower, tiled walls and compact vanity
Layout changes usually move the budget most.

Build your estimate

Start with what you know. Every change updates the cost range instantly.

1Room & location
Length (ft)
×
Width (ft)
2Scope of work
3Finishes & fixtures
4Optional upgrades

Email me this estimate

Want this estimate in your inbox? We will email it to you, and add you to the weekly Money Moves newsletter with rate updates and money tips. One email a week, unsubscribe anytime.

Your email address and estimate are sent via FormSubmit to northpeakest@proton.me so we can email your estimate and the weekly Money Moves newsletter. We do not sell your information. This site also shows ads served by Google AdSense.

Advertisement

Bathroom renovation cost in Canada

Published national prices differ because “remodel” can mean anything from new paint to a room stripped to studs. These bands define the work so comparisons are useful.

Cosmetic refresh

$5,000–$10,000
  • Keep plumbing and layout
  • New vanity, toilet or fixtures
  • Paint and limited tile

Full mid-range remodel

$10,000–$21,000+
  • Replace most finishes
  • New tub or shower, vanity, floor
  • Limited electrical updates

Primary ensuite

$18,000–$35,000+
  • Larger footprint or custom shower
  • Premium tile and double vanity
  • Layout changes push higher

The five biggest bathroom remodel cost drivers

Square footage matters, but wet-area complexity and licensed trade work usually matter more.

01

Moving plumbing

Relocating a toilet, shower drain or vanity means opening walls or floors and may trigger permits.

02

Shower construction

Custom pans, niches, benches and frameless glass add labour and waterproofing steps.

03

Finish tier

Tile, plumbing trim, cabinetry and glass widen rapidly from stock to custom.

04

Hidden conditions

Rot, mould, inadequate venting, old wiring or galvanized pipes drive change orders.

05

Local labour & access

GTA and Vancouver tend to price higher; condos and remote sites add logistics.

Full bathroom remodel vs partial renovation

A partial remodel makes sense when the room functions well and waterproofing is sound. A full gut is the better comparison when leaks, layout, wiring or plumbing need correction.

Choose a partial remodel when…

  • The tub or shower assembly is sound.
  • Fixtures can stay in their current locations.
  • Ventilation and electrical already meet the need.
  • The goal is appearance, storage or resale presentation.

Best savings move: replace the vanity, mirror, lighting and paint while keeping the wet area intact.

Choose a full remodel when…

  • There is water damage, persistent mould or soft subfloor.
  • The shower waterproofing is failing.
  • The layout blocks accessibility or storage.
  • Old pipes, wiring or ventilation need upgrades.

Budget reality: demolition costs more, but it exposes systems before new finishes conceal them.

Bathroom fixture replacement cost guide

Installed prices combine the product, removal, connections and ordinary labour. Unusual rough-ins, wall repair and premium products add cost.

Fixture or upgradePlanning allowanceMain price driver
Toilet replacement$630–$1,350Model, flange repair, disposal
Sink installation$430–$730Mount type and counter work
Bathtub installation$1,400–$2,800Access, surround, plumbing
Move one plumbing fixture$1,800–$4,500Drain access and distance
Heated floor$1,200–$2,800Area and new circuit
Frameless shower glass$1,500–$4,000+Size and hardware
Custom vanity$3,500–$10,000+Width, wood, countertop
Electrical updates$500–$2,000Fan, lights, GFCI, panel

Bathroom tile and labour cost

Tile cost is more than the box price. A complete allowance covers substrate preparation, waterproofing in wet areas, setting materials, cuts, grout, edge trim and labour.

Material planning ranges

  • Ceramic tile: roughly $3–$6/sq ft.
  • Porcelain tile: roughly $9–$15/sq ft.
  • Marble: roughly $22–$30/sq ft.

Order extra for cuts and breakage. Pattern, tile size and room shape affect waste.

Why labour varies

  • Large-format tile needs flatter substrates.
  • Mosaics and herringbone increase layout time.
  • Shower floors need careful slope to the drain.
  • Niches and benches create extra edges and waterproofing.

A low tile quote may exclude substrate repair or waterproofing; compare the written scope.

How to hire a bathroom renovation contractor

A clear scope gets clearer prices. Send the same project description to each bidder and compare exclusions—not only totals.

Measure the room and photograph every wall.
Decide which fixtures stay in place.
Choose a finish tier, not every exact product.
Ask if demolition and disposal are included.
Confirm permits, inspections and licensed trades.
Compare at least three itemized quotes.
Ask for insurance and recent references.
Keep 10–15% for hidden conditions.

Bathroom remodel FAQ

How accurate is this bathroom renovation calculator?

It is a planning model calibrated to published Canadian cost bands, not a contractor quote. Site conditions, product choices, taxes and contractor availability can change the final price.

How much contingency should I hold?

Use roughly 10% for a newer home with a well-understood scope, 12–15% for many typical remodels, and more for older homes or signs of moisture damage.

Do bathroom renovations need permits?

Like-for-like cosmetic work may not. Plumbing, electrical or structural changes commonly do, and requirements vary by municipality. Confirm before signing.

Can I save money by doing demolition myself?

Sometimes, but confirm what the contractor allows and whether hazardous materials or hidden services are possible. Plumbing and electrical should be handled by appropriately licensed trades.

How long does a bathroom remodel take?

A powder-room refresh can take days. A straightforward full bathroom often takes two to three weeks on site; layout changes, permits or custom material can extend it to four weeks or more.

What is the cheapest way to modernize a bathroom?

Keep the layout and wet area, then focus on paint, lighting, mirror, vanity hardware and a stock vanity. Avoid moving drains and opening a sound shower assembly.

Pricing references & method

Reference pricing checked October 4, 2026. This calculator uses published ranges as calibration points, then produces a project-specific planning estimate. Regional factors are directional allowances, not market quotes.

Included: typical demolition, disposal, general labour, plumbing, electrical allowance, waterproofing where applicable, selected fixtures and finishes, contractor coordination and age-adjusted contingency. Excluded: sales tax, asbestos or mould remediation, major structural engineering, temporary accommodation and financing.

Privacy Policy

This page displays ads from Google AdSense. Google and its partners may use cookies to serve personalized ads based on your browsing; you can opt out of personalized advertising in your Google account ad settings and learn more about how Google uses data from sites that use its services. The calculator itself runs entirely in your browser: this site collects no accounts, no analytics and no personal data, and nothing you enter is stored or sent anywhere. If you use the quote form above, your name, email, phone, city, and project details are sent via FormSubmit to northpeakest@proton.me so we can arrange your quotes. If you use the email-my-estimate form, your email address and estimate are sent via FormSubmit to northpeakest@proton.me so we can email your estimate and the weekly Money Moves newsletter; we do not sell your information.

Questions about this page: northpeakest@proton.me.

Bathroom remodel costs by city

Local 2026 cost guides for Ontario cities.

Get free quotes from local pros

Want bathroom remodel contractors to come to you? Fill this in and we will pass your project details to qualified local pros. Free, no obligation.

Your name, email, phone, city, and project details are sent via FormSubmit to northpeakest@proton.me so we can arrange your quotes. We do not sell your information. This site also shows ads served by Google AdSense.

Hiring a contractor?

The Reno Playbook ($29)

Word-for-word contractor vetting scripts, a line-item quote template that exposes lowball-then-extras traps, Ontario 10% holdback & milestone payment schedules, change-order scripts, and a printable project tracker.

Get The Reno Playbook — $29 CAD

Digital download · 18 pages · Written for Ontario homeowners · By NorthPeak Estimates

Doing it yourself?

Common buys for this project

What Ontario homeowners typically order for a bathroom remodel — check current prices and reviews on Amazon.ca:

As an Amazon Associate, NorthPeak Estimates earns from qualifying purchases — at no extra cost to you. See our affiliate disclosure.

Bathroom budgets, without the guesswork

Home Cost Weekly — one short email a week: what things really cost in Ontario, the week's best home-product deal, and one practical tip. Plus your free 2026 Ontario Home Cost Cheat Sheet the moment you confirm.

Free forever. We never sell or share your email. Unsubscribe anytime with one click. Privacy & disclosure.