Pressure-treated
- Lowest initial cost and widely available.
- Needs cleaning and stain or sealer every two to three years.
- Can check, splinter or warp as moisture changes.
Ontario pricing • CAD • 2026 planning range
Build a realistic low-to-high budget for a new Ontario deck, including the surface, structure, labour, railings, stairs, built-ins and local permit allowance.
Ready to compare local bids? Contractor matching is being prepared.
Planning allowance for this deck size; excludes damage, snow removal and board replacement.
Freeze-thaw cycles, standing snow, salt and strong summer sun all matter. Good drainage, proper spacing and code-compliant framing are as important as the surface product.
Use the estimate to plan, then confirm the actual structure and approvals with your municipality. Permit rules and fees are local.
Ontario municipalities apply the Building Code Act and local zoning. Ottawa requires a permit for attached or adjacent decks more than 600 mm (24 in.) above grade, regardless of area, and for certain larger freestanding decks.
The current 2024 Ontario Building Code, O. Reg. 163/24, applies to new permit applications and has been mandatory since April 1, 2025. Its Part 9 provisions include foundation depths in Article 9.12.2.2, stairs and guards in Section 9.8, and wood-frame construction in Section 9.23.
A common Ontario planning assumption is about 1.2 m (4 ft), but the Code does not make that one depth universal. Soil, frost penetration, drainage, deck attachment and the approved foundation system determine the requirement.
DIY can remove much of the carpentry labour, but it does not remove permit, inspection or structural obligations. HomeStars reports labour can make up 40%–60% of a typical quote.
HomeStars’ 2026 Canadian guide lists installed ranges of about $35–$60 per sq ft for pressure-treated lumber, $60–$105 for cedar or thermally modified wood, $65–$95 for composite and $80–$130 for PVC or capped polymer. Ontario urban labour, elevation and access can push a quote higher.
It depends on the municipality, size, height, attachment and use. Ottawa, for example, requires one for an attached or adjacent deck more than 600 mm above grade, and in other specific cases. Confirm with your local building department before construction.
Footings subject to frost movement need an accepted frost-protection approach. About 1.2 m (4 ft) is a common planning assumption in Ontario deck guidance, but your location, soil and approved drawings determine the real depth or pile system.
It can be if lower upkeep is important. Composite costs more upfront but avoids recurring staining and sealing. The maintenance comparison above makes the trade-off visible over ten years.
Yes, but DIY does not waive zoning, permits, inspections or code requirements. Elevated, attached, multi-level, roofed or unusually loaded decks are better candidates for professional design and installation.
Cost model reviewed against Canadian 2026 pricing and Ontario municipal guidance on October 4, 2026.