Kitchen renovation cost calculator

Build a practical low–high budget in Canadian dollars, then see which choices are carrying the cost.

CAD estimatesItemized instantlyNo sign-up
Renovated kitchen with quartz countertops, cabinetry and a large island
Image: CHBA

Plan your kitchen

Measure the finished floor area, not the whole main floor.
Fees vary by municipality and project value.

Where kitchen renovation money goes

A kitchen is a dense bundle of custom millwork, finished surfaces and regulated trades. The estimate above treats the room size as a starting point, then prices the selections that usually cause bids to separate.

Cabinetry

Door style, box construction, hardware, internal organizers and custom sizing can move this line from a reface to a major investment.

Labour & site work

Protection, demolition, disposal, drywall repair, installation, painting and coordination are captured in the core-work allowance.

Surfaces

Countertop fabrication, tile cuts, edge profiles and subfloor preparation matter as much as the material sticker price.

Mechanical trades

Keeping sinks, drains, outlets and appliance feeds in place usually costs less than changing the kitchen layout.

Budget signal: HomeStars publishes Toronto guide ranges of $6,000–$40,000+ for new cabinets, $8–$25 per sq. ft. for flooring and $20–$60 per sq. ft. for backsplash installation. Local quotes can still fall outside those ranges.

How to save without making the kitchen feel cheap

Keep the layout

Moving a sink, range, gas line or major appliance can trigger several trades at once. If the current work triangle functions, spend first on surfaces, storage and lighting.

Reface boxes that are sound

Refacing can preserve cabinet boxes while changing doors, fronts, hardware and exposed finishes. It is not the right fix for water-damaged, poorly built or badly configured cabinetry.

Use one focal upgrade

A durable countertop or well-planned lighting scheme can do more for the whole room than premium selections everywhere. Standard-size tile and readily available hardware also reduce labour and delay risk.

Finalize before demolition

Confirm appliance specifications, sink size, faucet, tile, cabinet drawings and electrical needs before work begins. Late substitutions create change orders and can force finished work to be redone.

When an Ontario kitchen needs a permit

Permit rules are administered by local municipalities. Ontario’s building-permit guide says applications go to the municipality and recommends speaking with the local building department about drawings, plans and any other approvals.

Cosmetic work such as painting, flooring and replacing cupboards without plumbing changes often does not require a building permit. A permit or separate approval may be needed when the project removes or changes a load-bearing wall, alters plumbing or mechanical systems, creates openings, or substantially changes the building.

Electrical is separate: electrical installation work may require notification to Ontario’s Electrical Safety Authority even when a municipal building permit is not required. Ask the electrician who is filing the notification and arranging inspection.

Do not treat the calculator’s permit allowance as a permit decision. Confirm requirements with your municipality before demolition and keep approved drawings on site for inspections.

Hiring a contractor: the quote checklist

The Canadian Home Builders’ Association recommends a written renovation contract covering the parties, detailed scope, schedule, price and payment plan, insurance and workers’ compensation, warranty, permits, change orders and dispute resolution.

  • Give every bidder the same drawings, material list and appliance specifications.
  • Ask for an itemized quote that separates demolition, labour, materials, subtrades, permits and waste.
  • Confirm who orders long-lead cabinets, appliances and fixtures—and who pays if dimensions are wrong.
  • Request current proof of liability insurance and WSIB clearance where applicable.
  • Put start dates, milestone payments, cleanup, inspections and warranty terms in writing.
  • Define a written change-order process before work starts; never approve scope changes only verbally.
  • Check recent, comparable projects and speak directly with references.

Kitchen renovation questions

How much does a kitchen renovation cost in Ontario?

A cosmetic refresh may stay in the low five figures, while a full mid-range renovation commonly reaches the tens of thousands and a large custom kitchen can exceed $75,000. Size, cabinetry, appliances, layout changes and local labour are the largest variables.

What is the most expensive part of a kitchen renovation?

Cabinetry is often the largest single line item, especially when cabinets are custom. Labour, demolition, trades and project management can collectively be just as significant on a full renovation.

Do I need a permit to renovate a kitchen in Ontario?

Simple cosmetic work may not require a building permit, but structural changes, altered plumbing or mechanical systems, and some electrical work can trigger municipal or Electrical Safety Authority requirements. Confirm with your municipality and qualified trades before work begins.

How much contingency should I keep?

A planning allowance of roughly 10% to 20% is common. Keep more room for older homes, wall openings, layout changes or work likely to reveal hidden conditions.

Does this estimate include HST?

No. The calculator is a project-planning range before HST. Ask each contractor whether tax, design, permit fees, delivery, disposal and temporary facilities are included in the quote.

Sources & methodology

Canada

United States

Estimator pricing model reviewed October 4, 2026 and designed as a 2025–2026 Ontario and 2026 US planning snapshot. Each mode uses its own published ranges and currency; it is not a contractor quote or legal, engineering or tax advice.