DIY the softscape
Keep excavation, walls and paver bases with the pros; handle mulch and smaller plantings yourself after the heavy work.
Canada-wide planning ranges
Build a realistic low-to-high budget for sod, garden beds, patios, retaining walls, drainage, irrigation and more—then take the itemized estimate to local contractors.
Enter only the work you need. Zero quantities are ignored. The model applies regional labour, access, finish and contingency adjustments.
Use these installed ranges as a quote-checking baseline—not a promise. Base preparation, disposal, equipment access and material grade can move a project quickly.
The lowest total is not necessarily the same scope. Ask every contractor to price the same written brief, then compare what is buried under the finished surface.
Your quote should state square footage, linear footage or unit count—not just “complete backyard.” That lets you compare unit rates and spot missing work.
For patios and walls, ask for excavation depth, aggregate type, compacted base depth, drainage and edge restraint. These invisible layers determine longevity.
Plant, stone and lighting allowances should name a dollar amount. Confirm whether delivery, equipment, disposal, permits and tax are included.
Write down who repairs lawn, fencing, irrigation or driveway damage caused by access. Ask where excavated soil and old material will go.
Use milestone payments tied to completed work. Get workmanship and plant-replacement warranty terms in writing before the deposit.
Keep excavation, walls and paver bases with the pros; handle mulch and smaller plantings yourself after the heavy work.
Complete drainage, grading and main hardscape first. Add lighting and premium planting in a later season without tearing work out.
Saving on hidden preparation can lead to settlement, weeds, frost movement and expensive rework. Simplify finishes instead.
Lawn cost guide
Sod wins on speed and erosion control. Seed wins on price and cultivar choice. The right answer depends less on appearance than on timing, slope, irrigation and tolerance for rework.
| Decision | Sod | Seed |
|---|---|---|
| Upfront cost | Higher; material is grown and delivered as rolls. | Lowest material cost. |
| Usable lawn | Visually immediate; root establishment still needs care. | Weeks to germinate and longer to fill evenly. |
| Best timing | Most of the growing season if watering is reliable and ground is not frozen. | Cool, moist spring or early fall windows are safest. |
| Slope / erosion | Strong choice because the soil is covered immediately. | Washout risk before roots establish. |
| Variety | Limited to locally available farm-grown blends. | Wider choice for shade, drought or traffic. |
Ask whether the price covers removal of the old lawn, disposal, topsoil depth, fine grading, starter fertilizer, delivery, rolling and the first watering. A low sod rate can hide the preparation work that determines whether the new lawn survives.
Both methods need steady moisture at the start. Seed may require several light waterings daily during germination; sod needs deep, consistent watering until roots knit into the soil. If you cannot maintain that schedule, include temporary irrigation or contractor aftercare in the budget.
Deck planning guide
Compare the installed price, maintenance commitment and design constraints—not just the board cost.
| Material | Best fit | Watch for |
|---|---|---|
| Pressure-treated | Lowest initial budget and a traditional wood surface. | Regular cleaning and staining; checking and splinters over time. |
| Cedar | Natural appearance, lighter boards and a premium wood finish. | Higher upfront cost; colour changes unless maintained. |
| Composite | Low-maintenance surface and long product warranties. | Higher board and fastener cost; heat and expansion details matter. |
| PVC | Wet locations and owners prioritizing minimal upkeep. | Highest mainstream price; appearance and heat retention vary by colour. |
Footings, height, stairs, railing length, privacy screens, demolition and access do not scale neatly with deck area. A small elevated deck can cost more per square foot than a large low platform. Ask for separate line items for structure, decking, railing, stairs and permits.
Wood is often the value option when someone is willing to clean and refinish it. Composite narrows the lifetime-cost gap when maintenance would otherwise be hired out. Check the exact product line and warranty—“composite” covers a wide quality range.
Retaining wall guide
Price walls by visible face area: length × exposed height. Then account for the work behind the wall—base, drainage, reinforcement and excavation.
A taller wall carries more soil pressure, requires more excavation and may need geogrid, engineered footings or municipal review. Local rules vary, so do not assume a decorative-wall detail is appropriate for a structural wall near a driveway, foundation or property line.
Water pressure is a common reason walls move or fail. A complete quote should describe free-draining backfill, filter fabric, perforated drain pipe and where water will discharge. “Blocks and labour” is not a complete wall specification.
Contractor hiring guide
Give each bidder the same measured brief, then compare scope, process, schedule and risk—not just the total.
Photograph the site, measure the main areas, note gate widths and identify any known utilities, drainage problems or access restrictions. Decide what is essential, what is optional and which finish decisions are still open. The estimate above can become your first scope sheet.
Be cautious when a large project has no quantities, material specifications or site-preparation details; when a deposit is disproportionate to work or materials; or when verbal promises do not appear in the contract. A quote can be short and still be clear, but “all landscaping included” is not enough.
Create rows for demolition, grading, drainage, base work, each finish material, planting, delivery, equipment, cleanup, tax and warranty. Mark an item “included,” “allowance,” “excluded” or “unclear” for each contractor. Resolve unclear rows before choosing.
Copy or download the itemized result, add photos and your target dates, and give the same package to three qualified local contractors.
Return to calculatorHomeowner FAQs
Short answers to the questions that most often change a project’s real budget.
Budget from the actual scope rather than a fixed percentage of home value. A lawn refresh can be a few thousand dollars; a yard with patios, walls, drainage and mature planting can reach tens of thousands.
They may include different excavation, base depths, materials, disposal or plant sizes. Compare quantities and specifications line by line before treating the lower total as a saving.
Often for sod, garden beds, patios and wall face area. Drainage, access, stairs, trees and small-project mobilization are usually better priced as separate items.
No. The calculator produces a planning range in Canadian dollars before sales tax, permits, engineering and unusual subsurface conditions.
Reduce complexity, phase decorative items, choose standard materials and keep machine access open. Do not reduce drainage or base preparation; those cuts often create expensive failures.
Three comparable written quotes usually reveal the market range while keeping the process manageable. More quotes do not help if each contractor prices a different scope.
Design and quote before the busiest spring and early-summer period when possible. Planting, seed and sod also have weather-dependent establishment windows.
Possibly. Rules depend on municipality, height, loading and proximity to structures or property lines. Confirm locally before construction.
Share a realistic range and distinguish essentials from options. Also request measured quantities so the design can be adjusted without losing cost transparency.
Ten percent is a practical starting cushion; 15% is safer for older properties, hidden demolition, poor access or unknown drainage and soil conditions.
Share the same project brief with qualified contractors so every response starts from comparable information.
Enter the location and contact details you choose to share. The button opens your email app with a formatted request; nothing leaves this page until you review and send it.
Planning model updated October 2026. Core rates use published Canadian contractor ranges, then adjust for market, finish, terrain and access. Tree and site-work allowances are broader because species, machinery and disposal vary sharply. Prices exclude sales tax and cannot capture buried utilities, contaminated soil, permits or engineering.
This page displays ads from Google AdSense. Google and its partners may use cookies to serve personalized ads based on your browsing; you can opt out of personalized advertising in your Google account ad settings. The calculator itself runs entirely in your browser: this site collects no accounts, no analytics and no personal data, and nothing you enter is stored or sent anywhere.
Questions about this page: northpeakestimates@proton.me.